Contact Us

Office +612 6946 2201

Mobile: 0404 056 744

Email: admin@adelongengineering.com.au

 

Online Enquiry

Please call me back
* Required fields

 Projects

 

visy 9 & 10 Tumut, NSW

  • Valmet Opti Press Installation
  • HTC Turbine Upgrade (2017) 11.5MW
  • Opti Dry Installation (2015)
  • RCF Pulper Combisorter/Dewiring Upgrade
  • HTC Turbine Coupling/Gearbox Upgrade
  • Major Reel Handling Upgrade Sicma, Italy
  • Annual major shut downs
  • Novapanti Dryer Section Hood Construction
  • MAN Turbo Vacuum System Installation
  • HTC Turbine B and Generator Installation
  • RCF/Pulper upgrade June-Dec 2015

 

VISY 4 & 5: Melbourne, vic

  • Heavy Duty Conveyor Upgrade
  • Annual Major Shutdowns

 

visy: co-generation - coolaroo, vic

  • Boiler upgrade 2018
  •  

 

visy 3 & 6 - Smithfield, NSW

  • HD Conveyor
  • First Section Dryer Can Upgrade
  • Annual major shut downs

 

visy 8, Gibson Island (Brisbane), QLD

  • Pulp Gear Upgrade
  • Stock Prep Upgrade
  • Heavy Pump Installation
  • Annual major shut downs